翻訳と辞書
Words near each other
・ China Railway Engineering Corporation
・ China Railway Erju
・ China Railway Group Limited
・ China Railway High-speed
・ China Railway Materials
・ China Railway Museum
・ China Railway No.5 Engineering Group
・ China Railway Seventh Group
・ China Railway Siyuan Survey and Design Group Co., Ltd.
・ China Railways 6K
・ China railways CIT trains
・ China Railways CRH1
・ China Railways CRH2
・ China Railways CRH3
・ China Railways CRH380A
China Railways CRH5
・ China Railways CRH6
・ China Railways DF11
・ China Railways DF4
・ China Railways DF5
・ China Railways DF8
・ China Railways DFH mainline locomotives
・ China Railways DFH shunting locomotives
・ China Railways DJ1
・ China Railways DJJ1
・ China Railways ET7
・ China Railways FD
・ China Railways GJ
・ China Railways HXD1
・ China Railways HXD1D


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

China Railways CRH5 : ウィキペディア英語版
China Railways CRH5

The China Railways CRH5 is an electric multiple unit high-speed train in use with China Railway High-speed in the People's Republic of China. The CRH5 is based on the ETR-600 New Pendolino used in Italy.
The CRH5 are non-tilting trains, developed for the Chinese Railways and which technology has been transferred to local manufacturers.〔http://www.infrastructurist.com/2009/11/20/meet-the-train-makers-part-6-china/〕 The CRH5 have a design speed of up to and now operate steadily at .〔http://www.chinacnr.com/LISTS/product/_MAINPAGE/product/default2.aspx?classid=406〕〔http://www.trainfanz.com/trains_electric_locomotive-english-3-CRH5.htm〕〔http://www.chinacartimes.com/2007/09/23/they-call-it-harmonious-chinese-bullet-trains/〕
==CRH5A==
In 2004, the Ministry of Railway in China contracted Alstom and CNR Changchun Railway Vehicles to produce 60 sets of the train with a maximum speed of . These trains have been given the designation CRH5A, and are still the only type of the CRH5 trains. 30 additional sets were ordered in 2009 and 20 additional sets were ordered in 2010 to complete the current fleet operating on China's northern and eastern lines.〔http://www.qizhong7.com/info/detail/4-4161.html〕〔http://news.xinmin.cn/rollnews/2010/10/13/7194620.html〕 On April 26, 2011, the MOR ordered an additional 30 sets.
As to the initial 60 sets, the first three were manufactured by Alstom's factory in Italy, and the next six were delivered in complete knock down form and assembled by CNR Changchun Railway Vehicle. The remaining 51 sets were built by CNR Changchun through technology transfer from Alstom.
The first train (CRH5-001A) departed from Savigliano port, Italy on December 11, 2006 and arrive at Dalian port on January 28, 2007. The first CRH5A set made by CNR Changchun (CRH5-010A) was delivered in April, 2007.
The CRH5A sets started service from April 18, 2007, the date of the sixth national railway speed-up at the Beijing-Harbin Railway. In the following years, it opened service at the Jinan-Qingdao high-speed rail and Shijiazhuang-Taiyuan high-speed rail.
Each of the CRH5A set consists of 8 cars. The initial 12 sets (CRH5-001A ~ CRH5-012A) have one first-class seating car (ZY), six second-class seating cars (ZE), and one second-class seating/dining car (ZEC). The subsequent sets have two first-class seating cars (ZY) and six second-class seating cars (ZE).
The CRH5A trains experienced a number of failures in early stages. The failures were attributed to new technologies introduced on CRH5A and a relatively short trial run before the first delivery 〔http://www.aboter.com/enread/article/view4539.html〕〔http://www.japanprobe.com/2007/05/21/chinese-bullet-train-suffering-from-theft-vandalism/〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「China Railways CRH5」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.